header image
Home arrow Blog
Blog - A frequent, chronological publication of the cooperative and Web links.
NOTICE OF POWER INTERRUPTION (07/25/2010)
Jul 23, 2010 at 12:00 AM

The AKELCO Management would like to inform the public of the scheduled power interruption
in the following area.

 

Date

Time

Affected Area

Reasons

July 25,  2010

(SUNDAY)

 

6:00AM

5:00PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 6:00AM-2:00PM

 4:45PM-5:00PM
 (ISOLATION OF POWER FROM GBPC NEW WASHINGTON AND RESTORATION OF POWER FROM NGCP)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  6:00AM-8:00AM
(ISOLATION OF POWER FROM NGCP AND RESTORATION OF POWER FROM GBPC NABAS)
4:30PM-5:00PM
(ISOLATION OF POWER FROM GBPC NABAS AND RESTORATION OF POWER FROM NGCP)
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8:00AM-11AM

 

 

 

 

 

 

 

 

 

11:AM-4:00PM

 

 

 

 

 

 

  2:00PM-4:45 PM





 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   8:00AM-

4:30PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  6:00AM-8:00AM

11:00AM-4:00PM












6:00AM-11:00AM
AND
4:00PM-5:00PM
 

 

 

 

 

 

 

 

 

 

(NO POWER)
 
ANDAGAO SUB-STATION 1

FEEDER 1:

•    FROM ANDAGAO SUB-STATION TO
•    CAPITOL
•    ESTANCIA
•    TIGAYON
•    LINABUAN SUR
•    LINABUAN NORTE
•    BANGA
•    BALETE
•    LIBACAO AND
•    MADALAG

FEEDER 2 – 1:
FROM ANDAGAO SUBSTATION TO:
• QUEZON AVENUE;
• PORTION OF  MAAGMA ST;
• BRGY. MOBO;
• C. QUIMPO & F. QUIMPO STS.,
• C. LASERNA & M. LASERNA STS.,
• L.  BARRIOS ST. IBABAW;
• RIZAL ST.;
• ARCHBISHOP REYES ST.,
• PASTRANA ST IBABAW;
• DR. GONZALES ST. CORNER OYO TORONG IBABAW CORNER ROXAS AVENUE;
• ACEVEDO ST. IBABAW;
• 19 MARTYRS ST.;
• REGALADO ST.;
• MARTELINO ST.

ALTAVAS SUB-STATION

WHOLE MUNICIPALITY OF ALTAVAS & BATAN:

Feeder 4:
•    ALTAVAS SUBSTATION GOING TO BALETE

FEEDER 16:
•    ALTAVAS SUBSTATION GOING TO BATAN

 

ANDAGAO SUB-STATION 
FEEDER 2:
FROM ANDAGAO SUBSTATION TO:
•    QUEZON AVE.
•    PORTION OF MAAGMA ST.
•    VETERANS AVE.
•    MABINI ST.
•    ROXAS AVENUE
•    OYO TORONG ST. UBOS
•    ACEVEDO ST. UBOS
•    L. BARRIOS UBOS
•    C. LASERNA EXTENSION
•     N. ROLDAN ST.
•    J. MAGNO ST.
•    CONCEPCION ST.
•    PASTRANA UBOS
•    VETERANS AVENUE
•    TOTING REYES ST.
•    NEW & OLD BUSWANG
•    BLISS SITE
•     BAKHAW SUR & NORTE
•    BRGY. ANDAGAO
•    PORTION OF BRGY. POOK


FEEDER 3
•    FROM ANDAGAO SUB-STATION TO
•    BRGY. POOK
•    KALIBO AIRPORT
•    CAANO
•    NALOOK
•    MABILO, KALIBO
& WHOLE MUNICIPALITY OF NEW WASHINGTON

 

 NABAS SUB-STATION

WHOLE MUNICIPALITY OF:
•    IBAJAY
•    NABAS
•    PANDAN, ANTIQUE
•    LIBERTAD, ANTIQUE

FEEDER 5:
•    NABAS SUBSTATION GOING TO IBAJAY AND PORTION OF TANGALAN

FEEDER 6:
•    NABAS SUBSTATION GOING TO CATICLAN

FEEDER 7:
•    NABAS SUBSTATION GOING TO PANDAN AND LIBERTAD ANTIQUE

LEZO SUB-STATION
WHOLE MUNICIPALITY OF:
•    LEZO
•    MALINAO
•    NUMANCIA
•    MAKATO
•     TANGALAN

FEEDER 8:
•    LEZO SUBSTATION GOING TO TANGALAN

FEEDER 9:
•    LEZO SUBSTATION GOING TO MALINAO
 

BORACAY SUBSTATION
WHOLE MUNICIPALITY OF:
•    MALAY AND BURUANGA
FEEDER 11:
•    BORACAY SUBSTATION GOING TO CATICLAN AND BURUANGA

FEEDER 12:
•    BORACAY SUBSTATION GOING TO YAPAK

 

BORACAY SUBSTATION

FEEDER 10:
•    BORACAY SUBSTATION GOING TO BALABAG (BEACH LINE)


AREAS WITH POWER THROUGH ISLANDING GENERATION OF GBPC NEW WASHINGTON AND GBPC NABAS

ANDAGAO SUB-STATION FEEDER 2:

•    ROXAS AVENUE
•     MABINI ST.
•    OYO TORONG ST. UBOS
•    ACEVEDO ST. UBOS
•    L. BARRIOS UBOS
•    C. LASERNA EXTENSION
•     N. ROLDAN ST.
•    J. MAGNO ST.
•    CONCEPCION ST.
•    PASTRANA UBOS
•    VETERANS AVENUE TO GOMBURZA
•    TOTING REYES ST.
•    NEW & OLD BUSWANG
•    BLISS SITE
•     BAKHAW SUR & NORTE
•    BRGY. ANDAGAO
•    PORTION OF BRGY. POOK

FEEDER 3

•    FROM ANDAGAO SUB-STATION TO
•    BRGY. POOK
•    KALIBO AIRPORT
•    CAANO
•    NALOOK
•    MABILO, KALIBO
& WHOLE MUNICIPALITY OF NEW WASHINGTON


NABAS SUB-STATION
WHOLE MUNICIPALITY OF:
•    IBAJAY
•    NABAS
•    PANDAN, ANTIQUE
•    LIBERTAD, ANTIQUE

FEEDER 5:
•    NABAS SUBSTATION GOING TO IBAJAY AND PORTION OF TANGALAN

FEEDER 6:
•    NABAS SUBSTATION GOING TO CATICLAN

FEEDER 7:
•    NABAS SUBSTATION GOING TO PANDAN AND LIBERTAD ANTIQUE

LEZO SUB-STATION
WHOLE MUNICIPALITY OF:
•    LEZO
•    NUMANCIA
•    PORTION OF MAKATO
•    AND PORTION OF MALINAO
•    
FEEDER 8:
LEZO SUBSTATION:

•    WHOLE MUNICIPALITY OF NUMANCIA UP TO

•    POBLACION, MAKATO


FEEDER 9:
LEZO SUBSTATION:
 
•    WHOLE MUNICIPALITY OF LEZO UP TO

•    POBLACION, MALINAO
 

BORACAY SUBSTATION
WHOLE MUNICIPALITY OF:
•    MALAY AND BURUANGA

FEEDER 11:
•    BORACAY SUBSTATION GOING TO CATICLAN AND BURUANGA

FEEDER 12:
•    BORACAY SUBSTATION GOING TO YAPAK



FEEDER 10:
•    BORACAY SUBSTATION GOING TO BALABAG (BEACH LINE)


NOTE:  THE ACTUAL POWER RESTORATION TIME COULD VARY FROM THE EARLIER NGCP’S ANNOUNCED SCHEDULED TIME (6:00AM-5:00PM) WITHOUT PRIOR NOTICE. THIS IS DUE TO SOP: IMMEDIATE ENERGIZATION OF 69KV TRANSMISSION LINE (PANIT-AN TO CATICLAN) ONLY AFTER THE TIME OF COMPLETION OR TERMINATION OF NGCP AND AKELCO’S SCHEDULED ACTIVITIES
 

 

DE-ENERGIZATIOM OF 138KV NGCP/TRANSCO DINGLE-PANIT-AN TRANSMISSION LINE TO CONDUCT THE FOLLOWING ACTIVITIES:

1. HOTSPOT CORRECTION AT 138KV INCOMING DSW’s

2. REPLACEMENT OF TWO (2) WOODPOLE BUS STRUCTURES OF CAP.BANK.NO.2

3. SIMULTANEOUS MAINTENANCE ALONG 69KV NABAS-CULASI TRANSMISSION LINE

4. RESTORATION OF PCB 51NB4 AT NABAS SWITCHING STATION

AND SIMULTANEOUS TAPPING OF NEWLY INSTALLED MEDIUM VOLTAGE SWITCH GEAR AT AKELCO SUBSTATION 1 AND SPLITTING OF EXISTING FEEDER 2 DISTRIBUTION LINE


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For more information and inquiry, you may call CP No. 09209499611 and look for

Engr. Joel C. Martinez, Engineering Department Manager or
Engr. Arnaldo Arboleda, Area Engineer, Boracay Substation at Tel. No. 288-3373.

 


Thank you.   
           
RENCE NECESITO-OCZON           
Public Information Officer   


Approved by:                                                               Noted:

 

 

ENGR. JOEL MARTINEZ(SGN)                                    ENGR. RICARDO ILETO(SGN)

Engineering Department Manager                          AGM for Engineering                 
Last Updated ( Jul 23, 2010 at 05:23 PM )
Buwanang Papremyo mula sa AKELCO Raffle Promo
Jul 16, 2010 at 12:00 AM
PAHISAYOD
 
Ginapahisayod it taeatapan it akelco nga may pagahiwaton nga “Buwanang Papremyo mula sa AKELCO Raffle Promo”. Daya hay bukas sa tanan nga miembro-konsumidor it AKELCO (pwera du mga empleyado) nga magabayad it anda nga power bill sa due date ag bago du nataeana nga due date eamang. Sanda hay pagataw-an it raffle coupon nga ihueog sa drop boxes nga nakabutang sa tanan nga akelco paying office. Du mga magada-og hay igaanunsyo sa radyo o padaehan it sueat. Du premyo hay pwede mabu-oe sa sueod it sang buean paagi sa pagpresintar it ana nga power bill ag maski ano nga balido nga aydentipikasyon. Ru nakataeana nga skedyul it raffle hay ru mga masunod sa tanan nga akelco area office.
 
 August 16, 2010
3:00 p.m.
 September 15, 2010 3:00 p.m.
 October 15, 2010 3:00 p.m.
 November 15, 2010
3:00 p.m.
 December 15, 2010
3:00 p.m.
 January 17, 2011 3:00 p.m.
 

Last Updated ( Jul 21, 2010 at 02:06 PM )
Read more...
RAFFLE GUIDELINES/MECHANICS
Jul 16, 2010 at 12:00 AM

1. Raffle shall be open to all member-consumers of the Aklan Electric Cooperative, Incorporated.
2. Employees of AKELCO are not  entitled to join the raffle promo.
3. The eight (8) Area Offices of AKELCO, namely Altavas, Banga, Kalibo, Lezo, Ibajay, Caticlan and Boracay will simultaneously conduct a monthly Raffle Draw starting August 2010 to January 2011 covering the billing month of July to December 2010.
4. Member-consumers who pay their power bill on or before the due date shall be given a raffle coupon. They will simply write their name, address and signature and drop it in the drop boxes located  in the area offices.
5. Individuals other than the registered members but actual occupant of households, establishments, apartment units, commercial establishments, and other structures connected to AKELCO lines shall inform the cooperative by affixing his/her name in the power bill upon tender of payments. This shall also include commercial and household structures registered to dead person but currently used/occupied by individuals including his/her families.
6. Member-consumers can drop their raffle coupon in  any  Area Office of the AKELCO coverage area.
7. There will be only one (1) major prize per draw per Area Office.
8. Non-winning entries are not eligible in the succeeding draw.
9. Winners will be announced in radio stations and notified through  letter.
10. Winners must present the power bill and any valid identification to claim their prizes.
11. Winners must claim their prizes within one (1) month after the draw, unclaimed prizes will be forfeited in favor of the cooperative.
12. All prizes are not convertible to cash.
13. Schedule of Raffle Draws:

 

August 16, 2010
3:00 P.M.
September 15, 2010 3:00 P.M.
October 15, 2010 3:00 P.M.
November 15, 2010 3:00 P.M.
December 15, 2010
3:00 P.M.
January 17, 2011 3:00 P.M.

 

Prepared by:                           


JOHN PASCUAL R. IBABAO(SGN)               
HR Division Manager                   



Noted:

EUGINA T. ENERO(SGN)
AGM for HR

                                          

Approved:


CHITO R. PERALTA(SGN)
General Manager

Last Updated ( Jul 16, 2010 at 03:19 PM )
Breakdown of Generation Charge (07/2010)
Jul 12, 2010 at 12:00 AM

FOR THE BILLING MONTH OF JULY 2010



(A)

(B)

(C)

(D=B+C)-PCR

(D/A)

SOURCE

% of Total kwH Purchased

kWh Purchased

Basic Generation Cost (PhP)

Adjustments (DAA, NSS and other Billing Adjustments) (PhP

Total Generation Cost for the Month (PhP)

Average Generation Cost (PhP/kWh)

GREEN CORE

68.66%

12,351,350.00

44,822,179.10


44,822,179.10

3.6289

BILATERAL CONTRACT W/ IPP:







1. GBPC

31.34%
5,636,625.00
38,369,270.67   38,369,270.67 6.8071

WESM





 


SELF-GENERATION







SALE FOR RESALE





 


OTHERS:

LESS: PILFERAGE COST RECOVERIES



124,342.86


TOTAL

100%

17,987,975.00

83,191,449.77


83,067,106.91

4.6179








Note:

1.  The effect of Global Business Power Corporation (GBPC) to the billing rate is summing to

only Php 0.9890 per kwh.

 

 

Prepared by:
 Checked/Reviewed by
Noted by:
 
 
 
ALEX S. PATRICIO(SGN)  HERMO L PATACSIL(SGN)
CHITO R. PERALTA(SGN)
Corplan Staff
  Corplan Division Manager
General Manager

Last Updated ( Jul 12, 2010 at 10:05 AM )
Power Rates (July 2010)
Jul 07, 2010 at 12:00 AM
 

AKELCO POWER RATES

 2010
Service Period Total Cost w/ E-VAT per kilowatt-hour
(Billing Month) Residen tial Commercial Industrial Public Building Street Lights  
January 8.7150
7.2555
7.4422
7.7386
11.1688
 

 In compliance to the Order of the Energy Regulatory Commission (ERC) docketed on January 25, 2010 re: Application  for the Approval of an Adjustment in Rates under (RSEC-WR)

 Service Period  

 LOW VOLTAGE

Total Cost w/ E-VAT per kilowatt-hour

 

 HIGH VOLTAGE
Total Cost w/ E-VAT per kilowatt-hour
----------------------------
Total Cost w/ E-VAT per kilowatt
(Billing Month) Residen tial Commer cial Indus trial Public Building Street Lights  Commer cial Indus trial
Public Building
 February 8.9228
7.4951
7.6211
7.8214
10.8964
7.4101
---------
24.6064
7.5361
---------
24.6064
7.7364
---------
24.6064
 March  8.9569  7.5484 7.6749
7.8764
10.9507
7.4633
---------
24.6064
7.5899
---------
24.6064
7.7913
---------
24.6064
 April 9.1192 7.7087 7.9014
8.0331
11.2068
7.6237
---------
24.6064
7.8164
---------
24.6064
7.9481
---------
24.6064
 May 8.7685
7.3125
 7.4645  7.5938  10.6953
7.2275
---------
24.6064
7.3795
---------
24.6064
7.5088
---------
24.6064
 June 8.4683
7.0118 7.2092
7.3931
10.4961
6.9268
---------
24.6064
7.1242
---------
24.6064
7.3081
---------
24.6064
 July  9.1015 7.6407
7.7867 7.9618
11.0673
7.5557
---------
24.6064
7.7016
---------
24.6064
7.8768
---------
24.6064
 August                
 September                
 October
               
 November
               
 December
               

 

AKELCO POWER RATES

 2009
Service Period Total Cost w/ E-VAT per kilowatt-hour
(Billing Month) Residential Commercial Industrial Public Building Street Lights
January 8.1894 7.0485 6.9931 7.5643 10.6194
 February 8.0985 6.9653 6.9216 7.4834 10.5187
 March 7.9898 6.8538 6.8401
7.3429
10.4344
 April 9.1301 7.7091 7.9367 8.1729 11.4025
 May 8.7199 7.2992
7.5268 7.7628
10.9930
 June 8.8131 7.3923
7.6201
7.8560
11.0857
 July 8.9744 7.5534
7.7813
8.0173
11.2471
 August 9.2233
7.8021
8.0298
8.3072
11.4930
 September 9.1124
7.6908
7.9190
8.1548
11.3846
 October
9.3858 7.9631
8.1918
8.4278
11.6576
 November
8.7477
7.4873
7.5437
8.1383
11.3149
 December
 8.3725 7.2241
7.4295
7.9487
 11.1375
 
 2008
Service Period Total Cost w/ E-VAT per kilowatt-hour
(Billing Month) Residential Commercial Industrial Public Building Street Lights
January 6.3402 5.1052 4.9699 5.4328 10.0057
February 7.8398 6.6064 6.5001 7.0275 11.4941
  March 7.9750 6.7425 6.6546 7.1592 11.6255
  April 8.0081 6.7685 6.6645 7.1932 11.6515
  May 7.9934 6.7538 6.6497 7.1786 11.6367
  June 8.0096 6.7743 6.6779 7.2001 11.6796
  July 8.6041 7.3766 7.2702 7.7917 12.2793
August
9.2971  8.0100 7.9372  8.4903  12.9341
 September 8.2621  7.0214 6.9238  7.4318  11.9325
 October 8.5940 7.4771 7.4500 7.9694 11.0618
 November 8.3773 7.2463 7.2180 7.7496
10.8320
 December 8.3832
7.2648
7.2250
7.7624
10.8521
 
 
 AKELCO MANAGEMENT
Last Updated ( Jul 07, 2010 at 03:40 PM )
<< Start < Previous 1 2 3 4 5 6 7 Next > End >>

Results 1 - 10 of 61
INFORMATION DISSEMINATION UKOL SA CONVERSION, PATULOY
Online Chat!
Online Chat Support
AKELCO Online Chat Center
Weather Forcast