NOTICE OF POWER INTERRUPTION (07/25/2010) |
|
Jul 23, 2010 at 12:00 AM |
|
The AKELCO Management would like to inform the public of the scheduled power interruption
in the following area.
|
Date
|
Time
|
Affected Area
|
Reasons
|
|
July 25, 2010
(SUNDAY)
|
6:00AM
5:00PM
6:00AM-2:00PM
4:45PM-5:00PM
(ISOLATION OF POWER FROM GBPC NEW WASHINGTON AND RESTORATION OF POWER FROM NGCP)
6:00AM-8:00AM
(ISOLATION OF POWER FROM NGCP AND RESTORATION OF POWER FROM GBPC NABAS)
4:30PM-5:00PM
(ISOLATION OF POWER FROM GBPC NABAS AND RESTORATION OF POWER FROM NGCP)
8:00AM-11AM
11:AM-4:00PM
2:00PM-4:45 PM
8:00AM-
4:30PM
6:00AM-8:00AM
11:00AM-4:00PM
6:00AM-11:00AM
AND
4:00PM-5:00PM
|
|
(NO POWER)
ANDAGAO SUB-STATION 1
FEEDER 1:
• FROM ANDAGAO SUB-STATION TO
• CAPITOL
• ESTANCIA
• TIGAYON
• LINABUAN SUR
• LINABUAN NORTE
• BANGA
• BALETE
• LIBACAO AND
• MADALAG
FEEDER 2 – 1:
FROM ANDAGAO SUBSTATION TO:
• QUEZON AVENUE;
• PORTION OF MAAGMA ST;
• BRGY. MOBO;
• C. QUIMPO & F. QUIMPO STS.,
• C. LASERNA & M. LASERNA STS.,
• L. BARRIOS ST. IBABAW;
• RIZAL ST.;
• ARCHBISHOP REYES ST.,
• PASTRANA ST IBABAW;
• DR. GONZALES ST. CORNER OYO TORONG IBABAW CORNER ROXAS AVENUE;
• ACEVEDO ST. IBABAW;
• 19 MARTYRS ST.;
• REGALADO ST.;
• MARTELINO ST.
ALTAVAS SUB-STATION
WHOLE MUNICIPALITY OF ALTAVAS & BATAN:
Feeder 4:
• ALTAVAS SUBSTATION GOING TO BALETE
FEEDER 16:
• ALTAVAS SUBSTATION GOING TO BATAN
ANDAGAO SUB-STATION
FEEDER 2:
FROM ANDAGAO SUBSTATION TO:
• QUEZON AVE.
• PORTION OF MAAGMA ST.
• VETERANS AVE.
• MABINI ST.
• ROXAS AVENUE
• OYO TORONG ST. UBOS
• ACEVEDO ST. UBOS
• L. BARRIOS UBOS
• C. LASERNA EXTENSION
• N. ROLDAN ST.
• J. MAGNO ST.
• CONCEPCION ST.
• PASTRANA UBOS
• VETERANS AVENUE
• TOTING REYES ST.
• NEW & OLD BUSWANG
• BLISS SITE
• BAKHAW SUR & NORTE
• BRGY. ANDAGAO
• PORTION OF BRGY. POOK
FEEDER 3
• FROM ANDAGAO SUB-STATION TO
• BRGY. POOK
• KALIBO AIRPORT
• CAANO
• NALOOK
• MABILO, KALIBO
& WHOLE MUNICIPALITY OF NEW WASHINGTON
NABAS SUB-STATION
WHOLE MUNICIPALITY OF:
• IBAJAY
• NABAS
• PANDAN, ANTIQUE
• LIBERTAD, ANTIQUE
FEEDER 5:
• NABAS SUBSTATION GOING TO IBAJAY AND PORTION OF TANGALAN
FEEDER 6:
• NABAS SUBSTATION GOING TO CATICLAN
FEEDER 7:
• NABAS SUBSTATION GOING TO PANDAN AND LIBERTAD ANTIQUE
LEZO SUB-STATION
WHOLE MUNICIPALITY OF:
• LEZO
• MALINAO
• NUMANCIA
• MAKATO
• TANGALAN
FEEDER 8:
• LEZO SUBSTATION GOING TO TANGALAN
FEEDER 9:
• LEZO SUBSTATION GOING TO MALINAO
BORACAY SUBSTATION
WHOLE MUNICIPALITY OF:
• MALAY AND BURUANGA
FEEDER 11:
• BORACAY SUBSTATION GOING TO CATICLAN AND BURUANGA
FEEDER 12:
• BORACAY SUBSTATION GOING TO YAPAK
BORACAY SUBSTATION
FEEDER 10:
• BORACAY SUBSTATION GOING TO BALABAG (BEACH LINE)
AREAS WITH POWER THROUGH ISLANDING GENERATION OF GBPC NEW WASHINGTON AND GBPC NABAS
ANDAGAO SUB-STATION FEEDER 2:
• ROXAS AVENUE
• MABINI ST.
• OYO TORONG ST. UBOS
• ACEVEDO ST. UBOS
• L. BARRIOS UBOS
• C. LASERNA EXTENSION
• N. ROLDAN ST.
• J. MAGNO ST.
• CONCEPCION ST.
• PASTRANA UBOS
• VETERANS AVENUE TO GOMBURZA
• TOTING REYES ST.
• NEW & OLD BUSWANG
• BLISS SITE
• BAKHAW SUR & NORTE
• BRGY. ANDAGAO
• PORTION OF BRGY. POOK
FEEDER 3
• FROM ANDAGAO SUB-STATION TO
• BRGY. POOK
• KALIBO AIRPORT
• CAANO
• NALOOK
• MABILO, KALIBO
& WHOLE MUNICIPALITY OF NEW WASHINGTON
NABAS SUB-STATION
WHOLE MUNICIPALITY OF:
• IBAJAY
• NABAS
• PANDAN, ANTIQUE
• LIBERTAD, ANTIQUE
FEEDER 5:
• NABAS SUBSTATION GOING TO IBAJAY AND PORTION OF TANGALAN
FEEDER 6:
• NABAS SUBSTATION GOING TO CATICLAN
FEEDER 7:
• NABAS SUBSTATION GOING TO PANDAN AND LIBERTAD ANTIQUE
LEZO SUB-STATION
WHOLE MUNICIPALITY OF:
• LEZO
• NUMANCIA
• PORTION OF MAKATO
• AND PORTION OF MALINAO
•
FEEDER 8:
LEZO SUBSTATION:
• WHOLE MUNICIPALITY OF NUMANCIA UP TO
• POBLACION, MAKATO
FEEDER 9:
LEZO SUBSTATION:
• WHOLE MUNICIPALITY OF LEZO UP TO
• POBLACION, MALINAO
BORACAY SUBSTATION
WHOLE MUNICIPALITY OF:
• MALAY AND BURUANGA
FEEDER 11:
• BORACAY SUBSTATION GOING TO CATICLAN AND BURUANGA
FEEDER 12:
• BORACAY SUBSTATION GOING TO YAPAK
FEEDER 10:
• BORACAY SUBSTATION GOING TO BALABAG (BEACH LINE)
NOTE: THE ACTUAL POWER RESTORATION TIME COULD VARY FROM THE EARLIER NGCP’S ANNOUNCED SCHEDULED TIME (6:00AM-5:00PM) WITHOUT PRIOR NOTICE. THIS IS DUE TO SOP: IMMEDIATE ENERGIZATION OF 69KV TRANSMISSION LINE (PANIT-AN TO CATICLAN) ONLY AFTER THE TIME OF COMPLETION OR TERMINATION OF NGCP AND AKELCO’S SCHEDULED ACTIVITIES
|
|
DE-ENERGIZATIOM OF 138KV NGCP/TRANSCO DINGLE-PANIT-AN TRANSMISSION LINE TO CONDUCT THE FOLLOWING ACTIVITIES:
1. HOTSPOT CORRECTION AT 138KV INCOMING DSW’s
2. REPLACEMENT OF TWO (2) WOODPOLE BUS STRUCTURES OF CAP.BANK.NO.2
3. SIMULTANEOUS MAINTENANCE ALONG 69KV NABAS-CULASI TRANSMISSION LINE
4. RESTORATION OF PCB 51NB4 AT NABAS SWITCHING STATION
AND SIMULTANEOUS TAPPING OF NEWLY INSTALLED MEDIUM VOLTAGE SWITCH GEAR AT AKELCO SUBSTATION 1 AND SPLITTING OF EXISTING FEEDER 2 DISTRIBUTION LINE
|
|
For more information and inquiry, you may call CP No. 09209499611 and look for
Engr. Joel C. Martinez, Engineering Department Manager or
Engr. Arnaldo Arboleda, Area Engineer, Boracay Substation at Tel. No. 288-3373.
Thank you.
RENCE NECESITO-OCZON
Public Information Officer
Approved by: Noted:
ENGR. JOEL MARTINEZ(SGN) ENGR.
RICARDO ILETO(SGN)
Engineering Department Manager AGM for Engineering
|
|
Last Updated ( Jul 23, 2010 at 05:23 PM )
|
|
|
Buwanang Papremyo mula sa AKELCO Raffle Promo |
|
Jul 16, 2010 at 12:00 AM |
|
PAHISAYOD
Ginapahisayod it taeatapan it akelco nga may pagahiwaton nga “Buwanang Papremyo mula sa AKELCO Raffle Promo”. Daya hay bukas sa tanan nga miembro-konsumidor it AKELCO (pwera du mga empleyado) nga magabayad it anda nga power bill sa due date ag bago du nataeana nga due date eamang. Sanda hay pagataw-an it raffle coupon nga ihueog sa drop boxes nga nakabutang sa tanan nga akelco paying office. Du mga magada-og hay igaanunsyo sa radyo o padaehan it sueat. Du premyo hay pwede mabu-oe sa sueod it sang buean paagi sa pagpresintar it ana nga power bill ag maski ano nga balido nga aydentipikasyon. Ru nakataeana nga skedyul it raffle hay ru mga masunod sa tanan nga akelco area office.
August 16, 2010
|
3:00 p.m.
|
| September 15, 2010 |
3:00 p.m. |
| October 15, 2010 |
3:00 p.m.
|
November 15, 2010
|
3:00 p.m.
|
December 15, 2010
|
3:00 p.m.
|
| January 17, 2011 |
3:00 p.m.
|
|
|
Last Updated ( Jul 21, 2010 at 02:06 PM )
|
|
Read more...
|
|
|
RAFFLE GUIDELINES/MECHANICS |
|
Jul 16, 2010 at 12:00 AM |
|
1. Raffle shall be open to all member-consumers of the Aklan Electric Cooperative, Incorporated.
2. Employees of AKELCO are not entitled to join the raffle promo.
3. The eight (8) Area Offices of AKELCO, namely Altavas, Banga, Kalibo, Lezo, Ibajay, Caticlan and Boracay will simultaneously conduct a monthly Raffle Draw starting August 2010 to January 2011 covering the billing month of July to December 2010.
4. Member-consumers who pay their power bill on or before the due date shall be given a raffle coupon. They will simply write their name, address and signature and drop it in the drop boxes located in the area offices.
5. Individuals other than the registered members but actual occupant of households, establishments, apartment units, commercial establishments, and other structures connected to AKELCO lines shall inform the cooperative by affixing his/her name in the power bill upon tender of payments. This shall also include commercial and household structures registered to dead person but currently used/occupied by individuals including his/her families.
6. Member-consumers can drop their raffle coupon in any Area Office of the AKELCO coverage area.
7. There will be only one (1) major prize per draw per Area Office.
8. Non-winning entries are not eligible in the succeeding draw.
9. Winners will be announced in radio stations and notified through letter.
10. Winners must present the power bill and any valid identification to claim their prizes.
11. Winners must claim their prizes within one (1) month after the draw, unclaimed prizes will be forfeited in favor of the cooperative.
12. All prizes are not convertible to cash.
13. Schedule of Raffle Draws:
August 16, 2010
|
3:00 P.M. |
| September 15, 2010 |
3:00 P.M. |
| October 15, 2010 |
3:00 P.M. |
| November 15, 2010 |
3:00 P.M. |
December 15, 2010
|
3:00 P.M. |
| January 17, 2011 |
3:00 P.M. |
Prepared by:
JOHN PASCUAL R. IBABAO(SGN)
HR Division Manager
Noted:
EUGINA T. ENERO(SGN)
AGM for HR
Approved:
CHITO R. PERALTA(SGN)
General Manager
|
|
Last Updated ( Jul 16, 2010 at 03:19 PM )
|
|
|
Breakdown of Generation Charge (07/2010) |
|
Jul 12, 2010 at 12:00 AM |
|
FOR THE BILLING MONTH OF JULY 2010
|
|
|
|
(A)
|
(B)
|
(C)
|
(D=B+C)-PCR
|
(D/A)
|
|
SOURCE
|
% of Total kwH Purchased
|
kWh Purchased
|
Basic Generation Cost (PhP)
|
Adjustments (DAA, NSS and other Billing Adjustments) (PhP
|
Total Generation Cost for the Month (PhP)
|
Average Generation Cost (PhP/kWh)
|
|
GREEN CORE
|
68.66%
|
12,351,350.00
|
44,822,179.10 |
|
44,822,179.10
|
3.6289
|
|
BILATERAL CONTRACT W/ IPP:
|
|
|
|
|
|
|
|
1. GBPC
|
31.34%
|
5,636,625.00
|
38,369,270.67 |
|
38,369,270.67 |
6.8071 |
|
WESM
|
|
|
|
|
|
|
|
SELF-GENERATION
|
|
|
|
|
|
|
|
SALE FOR RESALE
|
|
|
|
|
|
|
OTHERS:
LESS: PILFERAGE COST RECOVERIES
|
|
|
|
|
|
TOTAL
|
100%
|
17,987,975.00
|
83,191,449.77
|
|
83,067,106.91
|
4.6179
|
|
|
|
|
|
|
|
|
Note:
1. The effect of Global Business Power Corporation (GBPC) to the billing rate is summing to
only Php 0.9890 per kwh.
|
Prepared by: |
Checked/Reviewed by
|
Noted by: |
| |
|
|
|
ALEX S. PATRICIO(SGN) |
HERMO L PATACSIL(SGN) |
CHITO R. PERALTA(SGN) |
|
Corplan Staff |
Corplan Division Manager |
General Manager |
|
|
Last Updated ( Jul 12, 2010 at 10:05 AM )
|
|
|
Jul 07, 2010 at 12:00 AM |
| |
AKELCO POWER RATES |
| 2010 |
| Service Period |
Total Cost w/ E-VAT per kilowatt-hour |
| (Billing Month) |
Residen tial |
Commercial |
Industrial |
Public Building |
Street Lights |
|
| January |
8.7150
|
7.2555
|
7.4422
|
7.7386
|
11.1688
|
|
|
In compliance to the Order of the Energy Regulatory Commission (ERC) docketed on January 25, 2010 re: Application for the Approval of an Adjustment in Rates under (RSEC-WR)
|
| Service Period |
|
LOW VOLTAGE
Total Cost w/ E-VAT per kilowatt-hour
|
HIGH VOLTAGE
Total Cost w/ E-VAT per kilowatt-hour
----------------------------
Total Cost w/ E-VAT per kilowatt
|
| (Billing Month) |
Residen tial |
Commer cial |
Indus trial |
Public Building |
Street Lights |
Commer cial |
Indus trial
|
Public Building
|
| February |
8.9228
|
7.4951
|
7.6211
|
7.8214
|
10.8964
|
7.4101
---------
24.6064
|
7.5361
---------
24.6064
|
7.7364
---------
24.6064
|
| March |
8.9569 |
7.5484 |
7.6749
|
7.8764
|
10.9507
|
7.4633
---------
24.6064 |
7.5899
---------
24.6064
|
7.7913
---------
24.6064
|
| April |
9.1192 |
7.7087 |
7.9014 |
8.0331 |
11.2068 |
7.6237
---------
24.6064
|
7.8164
---------
24.6064 |
7.9481
---------
24.6064
|
| May |
8.7685
|
7.3125
|
7.4645 |
7.5938 |
10.6953 |
7.2275
---------
24.6064 |
7.3795
---------
24.6064 |
7.5088
---------
24.6064
|
| June |
8.4683
|
7.0118 |
7.2092
|
7.3931
|
10.4961
|
6.9268
---------
24.6064 |
7.1242
---------
24.6064 |
7.3081
---------
24.6064
|
| July |
9.1015 |
7.6407
|
7.7867 |
7.9618
|
11.0673
|
7.5557
---------
24.6064 |
7.7016
---------
24.6064 |
7.8768
---------
24.6064
|
| August |
|
|
|
|
|
|
|
|
| September |
|
|
|
|
|
|
|
|
October
|
|
|
|
|
|
|
|
|
November
|
|
|
|
|
|
|
|
|
December
|
|
|
|
|
|
|
|
|
|
AKELCO POWER RATES |
| 2009 |
| Service Period |
Total Cost w/ E-VAT per kilowatt-hour |
| (Billing Month) |
Residential |
Commercial |
Industrial |
Public Building |
Street Lights |
| January |
8.1894 |
7.0485 |
6.9931 |
7.5643 |
10.6194 |
| February |
8.0985 |
6.9653 |
6.9216 |
7.4834 |
10.5187
|
| March |
7.9898
|
6.8538 |
6.8401
|
7.3429
|
10.4344
|
| April |
9.1301 |
7.7091 |
7.9367 |
8.1729 |
11.4025 |
| May |
8.7199 |
7.2992
|
7.5268 |
7.7628
|
10.9930
|
| June |
8.8131 |
7.3923
|
7.6201
|
7.8560
|
11.0857 |
| July |
8.9744
|
7.5534
|
7.7813
|
8.0173
|
11.2471
|
| August |
9.2233
|
7.8021
|
8.0298
|
8.3072
|
11.4930
|
| September |
9.1124
|
7.6908
|
7.9190
|
8.1548
|
11.3846
|
October
|
9.3858 |
7.9631
|
8.1918
|
8.4278
|
11.6576
|
November
|
8.7477
|
7.4873
|
7.5437
|
8.1383
|
11.3149 |
December
|
8.3725 |
7.2241
|
7.4295
|
7.9487
|
11.1375 |
| |
| 2008 |
| Service Period |
Total Cost w/ E-VAT per kilowatt-hour |
| (Billing Month) |
Residential |
Commercial |
Industrial |
Public Building |
Street Lights |
| January |
6.3402 |
5.1052 |
4.9699 |
5.4328 |
10.0057 |
| February |
7.8398 |
6.6064 |
6.5001 |
7.0275 |
11.4941 |
| March |
7.9750 |
6.7425 |
6.6546 |
7.1592 |
11.6255
|
| April |
8.0081
|
6.7685
|
6.6645 |
7.1932 |
11.6515 |
| May |
7.9934 |
6.7538 |
6.6497 |
7.1786 |
11.6367 |
| June
|
8.0096 |
6.7743 |
6.6779 |
7.2001 |
11.6796 |
| July
|
8.6041 |
7.3766 |
7.2702 |
7.7917 |
12.2793 |
August
|
9.2971 |
8.0100 |
7.9372 |
8.4903 |
12.9341 |
| September
|
8.2621 |
7.0214 |
6.9238 |
7.4318 |
11.9325 |
| October |
8.5940 |
7.4771 |
7.4500 |
7.9694 |
11.0618 |
| November |
8.3773 |
7.2463 |
7.2180 |
7.7496
|
10.8320 |
| December |
8.3832
|
7.2648
|
7.2250
|
7.7624
|
10.8521
|
AKELCO MANAGEMENT
|
|
Last Updated ( Jul 07, 2010 at 03:40 PM )
|
|
| | << Start < Previous 1 2 3 4 5 6 7 Next > End >>
| | Results 1 - 10 of 61 | |