After a quite long wait, the
petition was finally granted and the verdict was given.
The Aklan Electric Cooperative,
Inc. (AKELCO) proudly announces as per Energy Regulatory Commission's (ERC)
decision, that the 2 million Minimum
Energy Off-Take (MEOT) on the GBPC
Nabas Power Plant is suspended for three
years.
For everyone's understanding, the
said MEOT is the energy contracted from the Global Business Power Corporation
(GBPC) Nabas Power Plant purchased by AKELCO which has been suspended because
of the ASPA. This is the effect of the Approved Ancillary Services Procurement
Plan (ASPA) between the TRANSCO (now NGCP) and AVON (or GBPC/Mirant/PPC). To
give us a full view of the picture, TRANSCO and AVON entered into a Memorandum
of Agreement (MOA) wherein an ancillary service must be provided by AVON Nabas
Power Plant as; Contingency (Spinning) Reserve; Reactive Power Support Service;
Back-up Reserve Service; and Black Start Service. The said MOA was brought
about by the power deficiency in the Cebu-Negros-Panay Grid likewise the inevitable
rise in power demand in the Visayas Grid in the coming years. The Ancillary
Services are therefore beneficial to the load consumers by way of reliable,
continuous and sufficient supply of power within the grid at a reasonable
price.
In this regard, TRANSCO is
mandated to act as system operator thus it is responsible for determining,
acquiring and dispatching the capacity needed to supply the required Grid
Ancillary Services. Moreover, GBPC Power Plant's generation will be supplied
directly to the grid and will be delivered to load consumers including AKELCO
through the NGCP lines. During interruptions, NGCP will have the sole control
of dispatching the necessary power in affected areas.
Below is an example of simulated
rate with ASPA showing a decreasing result to the Billing Rate.
|
Customer
Type
|
Existing
September 2009 Rates
|
Simulated
Rates w/ ASPA
|
Effect
of ASPA
(decrease
in rates)
|
|
RESIDENTIAL
|
9.1124
|
8.4230
|
(0.6894)
|
|
LIFELINE
RESIDENTIAL
|
6.4098
|
5.8969
|
(0.5129)
|
|
COMMERCIAL
|
7.6908
|
7.0014
|
(0.6894)
|
|
INDUSTRIAL
|
7.9190
|
7.2296
|
(0.6894)
|
|
PUBLIC
BUILDINGS
|
8.1548
|
7.4653
|
(0.6894)
|
|
STREET
LIGHTS
|
11.3846
|
10.6952
|
(0.6894)
|
*The
rate may vary/dependent on the billing rate per month.
Indeed,
the ASPA is good news for all Aklanons. It only proves that AKELCO doesn't turn
its back from criticisms and appeal but instead listens to everybody's call for
lower rates. Through the combined efforts of the coop's management and the
local officials, ASPA was initiated and ultimately won.